All services in Valencia

Repair · Valencia

Repair · Ducted air conditioning · Valencia

If the ceiling is finished, send available plans and photographs of existing access.

Describe the fault
Separate equipment from air distribution
Separate equipment from air distribution
  1. Unit and access hatch
  2. Air distribution
  3. Return air
Schematic illustration. The actual installation must be assessed on site.

Separate equipment from air distribution

Identify rooms with reduced airflow and whether the whole installation is affected. Prepare a plan of outlets, thermostat and service hatch.

Prepare the checks

The fault may involve the machine, a damper, return air or ducts. Before opening a closed ceiling, the affected area and reason for access should be explained.

Details to clarify for this work

Clarify whether the change concerns temperature or perceived airflow. These observations do not replace measurements, but help prepare access to either the network or the unit.

Other services from our group