All services in Altea

Maintenance · Altea

Heat pump maintenance in Altea

An Altea plant room needs to allow the cylinder, controls and outdoor unit to be assessed as one installation.

Request maintenance
Service the complete installation
Service the complete installation
  1. Outdoor unit
  2. Distribution
  3. Controls
Schematic illustration. The actual installation must be assessed on site.

Service the complete installation

If the Altea plant room also serves as storage, clear access before servicing without disturbing connections. The inventory should show stored items around the cylinder and the routes between appliances.

Checks and useful records

Include the cylinder, controls and outdoor unit in the inventory. Before moving storage, establish which clearances need preserving for future visits.

Retain the service findings

Ask the report to identify the parts checked and the conditions that need to be maintained while the property is unoccupied. The report should link each check to identified equipment and flag untested functions, so a plant-room visit is not presented as verification of the whole system.

Other services from our group